08 Aug Your WBS should be based upon your chosen Life Cycle Methodology and include any deliverables.
Create a Work Breakdown Structure (WBS) for the following scope:
- Requirement 1: 3 bedrooms
- Requirement 2: 2.5 bathrooms
- Requirement 3: Pool
- Requirement 4: 2 patios, one patio should be enclosed
Your WBS should be based upon your chosen Life Cycle Methodology and include any deliverables.
POST
Same Instructions1. Plagiarized free report2. Refer to Effective Project Management Traditional, Agile, Extreme, Hybrid 8th Edition textbookRobert K. WysockiISBN: 978-1-119-56280-1(MUST)3. APA format.4. Please Provide a Turnitin Report for Plagiarism Check.5.refer to Effective Project Management Traditional, Agile, Extreme, Hybrid 8th Edition textbookRobert K. WysockiISBN: 978-1-119-56280-1(MUST AND SHOULD).6. Please refer to the textbook in the body of the document.7. Please google for the textbook.Please refer to the textbook in the body of the document.
