Chat with us, powered by LiveChat BUS530 Unit5 Assignment and Rubric Creating a fireplace, home renovation project - EssayAbode

BUS530 Unit5 Assignment and Rubric Creating a fireplace, home renovation project

Creating a fireplace, home renovation project. budget, 12 thousand attached, picture of the project 

unit 5- budget assignment 

unit 6- risk levels 

each is one page, excel needed

Due Date: Sunday 11:59 pm EST of Unit 5

Points: 100

Overview:

This week's assignment is to develop a budget for the project selected in Unit 2.

Instructions:

Prepare the budget in Excel using your project WBS.

• There are many free budget templates and resources; two have been attached to

the assignment in the course. Use one of these resources rather than creating

something new.

• Include two tabs in your Excel document: WBS and Budget.

• Include a report name, your name, and date.

• Use at least three levels with a minimum of five (5) Level 1 tasks, two (2) Level 2

tasks, with three (3) Level 3 tasks.

• Continue to decompose the tasks/activities in your WBS until you have tasks

which are small enough to assign to an individual and accurate estimate the cost

of each activity.

• Use the Excel math functions when you create your report, for instance,

=sum(A3:A5).

• Do not hide numbers in formulas, for instance, =sum(A3,330), where 330 is a

cost.

• Include all project activities. Recall that we are rolling up the project

Requirements:

• Submit an Excel document.

Be sure to read the criteria by which your work will be evaluated before you write

and again after you write.

BUS530 – Project Managment

Preparing a Project Budget

Evaluation Rubric for Preparing a Budget Project Assignment

Criteria Exemplary Proficient Needs Improvement

Deficient

50 points 40 – 49 points 30 – 39 points 0 – 29 points

Level Content

Information is explained well for non-project participants to understand and succinct.

Information is explained pretty well for non-project participants to understand, and is mostly succinct.

Information is explained, but some confusing statements and is not succinct.

Information is not well explained and contains confusing statements and is long winded.

20 points 16 – 19 points 12 – 15 points 0 – 11 points

Level break down

Levels are broken down into the smallest parts possible.

Levels are mostly broken down into the smallest parts possible.

Levels are mostly broken down into the smallest parts possible.

Poor writing style Levels are mostly broken down into the smallest parts possible.

15 points 12 – 14 points 9 – 11 points 0 – 8 points Levels Contains 3 levels

with more than 5 level one tasks, 2 level two tasks and 3 level three tasks.

Contains 3 levels with 5 level one tasks, 2 level two tasks and 3 level three tasks.

Contains 2 or 3 levels with less than 4 level one tasks, 2 level two tasks and 3 level three tasks.

Contains 3 levels with 5 level one tasks, 2 level two tasks and 3 level three tasks.

5 points 4 points 3 points 0 – 2 points

Math Functions

Math functions are used through the whole project, no hidden numbers.

Math functions are mostly used through the whole project, few hidden numbers.

Math functions are partially used through the whole project, many hidden numbers.

Math functions are not used through the whole project, all or almost all numbers are hidden.

10 points 8 – 9 points 6 – 7 points 0 – 5 points

Project Activities

All activities are portrayed from the project.

Most of the activities are portrayed from the project.

Some of the activities are portrayed from the project.

Very few to none of the activities are portrayed from the project.

,

Due Date: Sunday 11:59 pm EST of Unit 6

Points: 100

Overview:

In this assignment, you will create a risk register highlighting all the potential risks

associated with the project that you selected in Unit 2.

Instructions:

You should have a professional-looking risk register that can stand on its own. In other words, anyone from the organization can read the content of the project risk register and have complete understanding about each risk item.

• Start by listing all the possible risks related to your project. Be sure to think about

every aspect of risk from personnel to weather and political to business issues.

• Use the risk template attached to the assignment in the course.

• Include 5 – 10 risks.

Requirements:

• Submit an Excel document.

Be sure to read the criteria by which your work will be evaluated before you write

and again after you write.

BUS530 – Project Managment

Preparing a Project Risk Register

Evaluation Rubric for Preparing a Project Risk Register Assignment

Criteria Exemplary Proficient Needs Improvement

Deficient

25 points

0 points

Risks Paper contains 5 – 10 risks.

n/a n/a Paper contains less than five risks or more than 10.

50 points 40 – 49 points 30 – 39 points 0 – 29 points

Analyzing Risks

All potential risks were determined.

Many of the potential risks were determined.

Some of the potential risks were determined.

Paper lacks many potential risks.

25 points 20 – 24 points 15 – 19 points 0 – 14 points Clear and Professional Writing

Writing and format are clear, professional, and error free.

Few errors that do not impede professional presentation.

Significant errors that do not impede professional presentation.

Errors impede professional presentation; guidelines not followed.

Related Tags

Academic APA Assignment Business Capstone College Conclusion Course Day Discussion Double Spaced Essay English Finance General Graduate History Information Justify Literature Management Market Masters Math Minimum MLA Nursing Organizational Outline Pages Paper Presentation Questions Questionnaire Reference Response Response School Subject Slides Sources Student Support Times New Roman Title Topics Word Write Writing