20 Nov Your task is to complete the Coral Bay Electronics case using Excel. You can find the case in the pdf file. Based on the information provided in the cas
***** Please read instructions below, attachments are also attached if needed. needed by Friday at least 10 PM CST I can answer the questions the case study is asking; I mainly need help with the excel and calculations. ****
Your task is to complete the Coral Bay Electronics case using Excel. You can find the case in the pdf file. Based on the information provided in the case, you are required to complete the cash flow estimation and conduct capital budgeting techniques to evaluate this proposal and make a final recommendation. The areas marked in yellow in the spreadsheet are the answers you should provide.
The case and the Excel spreadsheet are below. You will have two weeks to complete the spreadsheet and upload it here. When submitting your spreadsheet, change the file name to " Coral Bay Electronics_YOUR NAME."
Coral Bay Electronics_2.pdf Download Coral Bay Electronics_2.pdf
Coral Bay Electronics_Student_2.xlsx Download Coral Bay Electronics_Student_2.xlsx
The instructions for how to work the case can be found here: Instructions for Coral Bay Electronics Case
Project
Coral Bay Electronics | ||||||||||||||
Input Area: | ||||||||||||||
Equipment | ||||||||||||||
Salvage value | ||||||||||||||
R&D | ||||||||||||||
Marketing study | ||||||||||||||
Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||||||||||
New tracker sales(units) | ||||||||||||||
Depreciation rate | ||||||||||||||
Sales of old tracker | ||||||||||||||
Lost sales in old tracker (units) | ||||||||||||||
Price of new tracker | ||||||||||||||
Variable cost of new tracker | ||||||||||||||
Fixed cost of new tracker | ||||||||||||||
Price of old tracker | ||||||||||||||
Price reduction of old tracker | ||||||||||||||
Variable cost of old tracker | ||||||||||||||
Tax rate | ||||||||||||||
Net working capital: % of next year net sales | ||||||||||||||
Required return | ||||||||||||||
Output Area: | ||||||||||||||
Sales | Year 0 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||||||||
Sales of new tracker | ||||||||||||||
Lost sales due to new tracker | ||||||||||||||
Lost rev. due to new tracker | ||||||||||||||
Net sales of new tracker | ||||||||||||||
Variable Cost (VC) | ||||||||||||||
VC of new tracker | ||||||||||||||
VC saving-Due to existing sales loss | ||||||||||||||
Net VC of new tracker | ||||||||||||||
Net Sales | ||||||||||||||
Net variable costs | ||||||||||||||
Fixed costs | ||||||||||||||
Depreciation | ||||||||||||||
Operating income before taxes (EBIT) | ||||||||||||||
Taxes (20%) | ||||||||||||||
Net operating profit after taxes (NOPAT) | ||||||||||||||
+Depreciation | ||||||||||||||
Operating cash flows | ||||||||||||||
Net Working Capital Requirement (NWC) | ||||||||||||||
tc={BF327D80-BB3D-4062-9018-4808AEEC72ED}: [Threaded comment] Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924 Comment: NWC investment starts in year 0 | NWC Cash Flow | |||||||||||||
tc={B131CF15-39E9-4757-80B6-E62FD593ABA1}: [Threaded comment] Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924 Comment: It is the amount of the NWC that is not recovered yet | After-tax Salvage Value (year 5 only) | Year 5 | ||||||||||||
Salvage value | ||||||||||||||
Book value | ||||||||||||||
Gain or Loss | ||||||||||||||
After-tax salvage cash flow | ||||||||||||||
Net Cash Flow (Net CF) | Year 0 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||||||||
Cumulative Net CF | ||||||||||||||
Payback period | ||||||||||||||
PI | ||||||||||||||
IRR | ||||||||||||||
MIRR | ||||||||||||||
NPV | ||||||||||||||
Your final recommendation for this project: | ||||||||||||||
,
FIN 5213 Financial Management
Coral Bay Electronics
Coral Bay Electronics is a midsized electronics manufacturer located in St. Louis,
Missouri. The company president is Shelley Couts, who inherited the company. When it
was founded over 70 years ago, the company originally repaired radios and other
household appliances. Over the years, the company expanded into manufacturing and is
now a reputable manufacturer of various electronic items. Joe Hanks, a recent MBA
graduate, has been hired by the company’s finance department.
One of the major revenue-producing items manufactured by Coral Bay Electronics
is the fitness tracker. Coral Bay Electronics currently has a fitness tracker model on the
market, and sales have been excellent. However, as with any electronic item, technology
changes rapidly, and the current fitness tracker has limited features compared to newer
models from its competitors. Coral Bay Electronics spent $750,000 to develop a prototype
for a new generation fitness tracker that has all the features of the existing model but
adds new features such as an ECG monitor, GPS tracking, and heart rate monitoring.
The company has spent a further $250,000 on a marketing study to determine the
expected sales figures for the new fitness tracker.
Coral Bay Electronics can manufacture the new fitness tracker for $100 each in
variable costs. Fixed costs for the new operation are estimated to be $2.5 million annually.
The estimated sales volume is 75,000, 95,000, 100,000, 115,000, and 80,000 per year
for the next five years. The unit price of the new fitness tracker will be $220 for the first
three years, dropping to $175 in year 4 and year 5. The necessary equipment can be
purchased for $7.5 million and will be depreciated on a seven-year MACRS schedule
(see table below). It is believed the value of the equipment in five years will be $1.5 million.
As previously stated, Coral Bay Electronics currently manufactures fitness trackers.
Production of the existing model is expected to be terminated in two years. If Coral Bay
Electronics does not introduce the new fitness tracker, sales will be 60,000 and 50,000
units for the next two years, respectively. The price of the existing fitness tracker is $185
per unit, with variable costs of $ 90 each and fixed costs of $1,800,000 per year. If Coral
Bay Electronics does introduce the new fitness tracker, sales of the existing fitness tracker
are expected to fall by 25,000 units in year 1 and 35,000 in year 2, and the price of the
existing units is expected to be lowered to $120 for each unit. Net working capital (NWC)
FIN 5213 Financial Management
for the new fitness tracker is estimated to be 28% of next year’s sales. The total
investment in NWC is expected to be fully recovered when the project ends. Coral Bay
Electronics has a 20% corporate tax rate and a 15% required return.
Table 1: MACRS
Shelly has asked Joe to prepare a report using EXCEL to evaluate this new
project. Please use the following questions to guide you in working on the Excel
spreadsheet.
1. Will you include $750,000 in development spending and $250,000 in marketing
study costs in your project’s cash flow analysis? Why or why not? (answer in cell
D6&D7).
2. What are NET SALES and NET VARIABLE COSTS each year?
FIN 5213 Financial Management
3. What is the depreciation cost each year?
4. What is the operating cash flow each year?
5. What is the net working capital cash flow each year?
6. What is the cash flow on equipment sales in year 5 after adjusting taxes?
7. What are this project's net cash flows (Net CF) each year, starting from year 0?
8. What is the payback period for the project?
9. What is the profitability index of the project?
10. What is the IRR of the project?
11. What is the MIRR of the project?
12. What is the NPV of the project?
13. What is your final recommendation to the CEO about this new project?
,
Instructions for Coral Bay Electronics Case
1. Read the case carefully: The case content contains all the information needed to complete
this Excel spreadsheet. You don’t need to submit another document to answer the questions
stated in the case. These questions serve as guidelines to help you work on the spreadsheet.
2. Download and rename the Excel file: Download the Excel file attached in the folder and
rename it to "Coral Bay Electronics_YOUR NAME."
3. Open and complete the yellow Cells: In the Excel file, complete the cells marked in yellow.
a. Start with the input area, then proceed to the output area. Ensure you have the correct
numbers in the input area, as incorrect numbers will affect the accuracy of estimations in
the output area.
b. Identify the values for equipment spending, salvage value, R&D, and marketing study costs
in cells D4-D7. Provide an assessment and explanation on whether to include development
spending and marketing study costs in the relevant cash flow estimation in cells E6 and E7.
c. Fill in cells D10-H13 for new tracker sales, depreciation rate, sales of old trackers, and lost
sales of old trackers.
d. Obtain the values for the price of new trackers, variable costs of the new tracker, and other
variables in the input table. Be accurate when entering numbers for "price of old tracker,"
"price reduction of old tracker," and "variable cost of old tracker."
4. Begin working on the output area:
a. Ensure you use variables from the input area in formulas to calculate output area values.
For example, to calculate new tracker sales in cell D30, use the formula =D15*D10 rather
than typing numbers directly. Manually entering numbers in the output area is not
acceptable !
b. Start with sales estimation: Use new tracker sales and the price of new trackers from the
input area to complete cells D30-H30 for new tracker sales.
c. Estimate Side Effects: Estimate "Lost sales due to new tracker," which calculates sales loss
due to decreased sales units of old trackers times old trackers’ original price, and "Lost
revenue due to new tracker," which estimates revenue loss due to price reduction for old
trackers sold in years 1 and 2. Net sales of new trackers are calculated as new tracker sales
minus these negative side effects.
d. Complete variable cost estimation: Adjust variable cost (VC) savings on old trackers,
considering the drop in old tracker sales in years 1 and 2.
e. Calculate operating cash flow for Years 1 to 5: Use prior calculations for net sales and net
variable costs. Apply the MACRS table to calculate annual depreciation.
5. Prepare net working capital (NWC) estimation:
a. Cells C51-H51 represent the total NWC investment required each year. Cells C52-H52
show the amount of NWC invested or recovered each year. Negative numbers in row 52
indicate NWC investment (cash outflows), and positive numbers indicate NWC recovery
(cash inflows). Pay special attention to NWC recovery in year 5. Refer to class notes (p.
11-30) for details.
6. After-tax salvage value estimation (only in Year 5): Calculate the after-tax salvage value.
Pay attention to the capital gains or losses when selling the equipment. The after-tax salvage
value in H58 corresponds to the net terminal cash flow (class notes, p. 11-31).
7. Calculate net cash flow (Net CF): Combine all relevant cash flows above to calculate Net
Cash Flow in row 61 and determine cumulative Net CF in row 62.
8. Calculate financial metrics: Compute the payback period, profitability index (PI), net present
value (NPV), internal rate of return (IRR), modified internal rate of return (MIRR), and NPV
based on the estimated net cash flows.
9. Provide conclusion and final assessment: Conclude with an assessment of the project below
row 71.