Chat with us, powered by LiveChat 1. Three piezometers located 1000m apart, bottomed in the same horizontal aquifer. Piezometer A is due South of B a - EssayAbode

1. Three piezometers located 1000m apart, bottomed in the same horizontal aquifer. Piezometer A is due South of B a

  

1. Three piezometers located 1000m apart, bottomed in the same horizontal aquifer.

Piezometer A is due South of B and C is to the East of line AB.

The surface elevation at ABC is 95, 110, and 130m respectively. The depth of water in A is 5 m, B 30m, and C 35m. 

Determine the direction of groundwater flow. Show the triangle ABC.

2. The following field notes were taken at a nest of piezometers a,b,c installed side by side at a single site Piezometer a. b. c.

Elevation at surface (masl) 450 450 450

Depth of piezometer (m) 150 100 50

Depth of water (m) 27 47 30

Let A, B, C refer to the points of measurement of piezometers a, b, c.

Calculate the;

a. The hydraulic head at A, B, C in meters. 

b. The pressure head at A, B, C in meters. 

c. The elevation head at A, B, C in meters.

N.B

For Geoscientists and Environmental Scientists with knowledge in Water Resources Management

Related Tags

Academic APA Assignment Business Capstone College Conclusion Course Day Discussion Double Spaced Essay English Finance General Graduate History Information Justify Literature Management Market Masters Math Minimum MLA Nursing Organizational Outline Pages Paper Presentation Questions Questionnaire Reference Response Response School Subject Slides Sources Student Support Times New Roman Title Topics Word Write Writing