10 Mar A work center has the following open and planned orders for week 4. Calculate the total standard time required
the attached assignment below is to calculate the total standard time.
the formula is ( setup time + run time = total time (standard hours))
Calculating the Load 5.13
Instructions: A work center has the following open and planned orders for week 4. Calculate the total standard time required (load).
Work Center Orders
|
|
Order Quantity |
Setup Time (hours) |
Run Time (hours/piece) |
Total Time (hours) |
|
Released Orders: 120 |
300 |
1.00 |
0.10 |
|
|
340 |
200 |
2.50 |
0.30 |
|
|
Planned Orders: 560 |
300 |
3.00 |
0.25 |
|
|
780 |
500 |
2.00 |
0.15 |
|
|
Total Time (standard hours) |
|